A reflection on the issue on the execution of hidroenergetic projects within the current water resource regulation
DOI:
https://doi.org/10.18800/themis.201802.007Keywords:
Water Resource Law, hidroenergetic projects, water rights, turbined water, environmental flow, water availability leveraging planAbstract
When the law and the competent authorities contradict each other, the execution of projects is discouraged, among the growing legal uncertainty, which occurs with hidro-energetic projects in Peru. In this article, the author analyzes the current regulation on water resources to then identify and analyze three inconsistencies between what is regulated, what is stated and what actually happens regarding the concept of turbined water, the concept of environmental flow, and the implementation of the Water Availability Leveraging Plan.
Downloads
Download data is not yet available.
Downloads
Published
2019-10-15
How to Cite
Lock Benavides, S. (2019). A reflection on the issue on the execution of hidroenergetic projects within the current water resource regulation. THEMIS Revista De Derecho, (74), 39–54. https://doi.org/10.18800/themis.201802.007
Issue
Section
Derecho Ambiental
License
Copyright (c) 2019 TH?MIS-Revista de Derecho

This work is licensed under a Creative Commons Attribution 4.0 International License.
